Monday, March 5, 2012

habitat, tanks done, kites

HABITAT
each week as i work at the habitat for humanity house i have
more respect for those skilled people in the construction
industry and the adverse weather they have to work in

it was cold on saturday am
it was at 32 degrees and was windy
but there we were our there working
they do this every day in the winter
we do it only once or twice a week

thanks skilled craftsman and workers for the work you do

now i remember why i dont like to put up insulation as
i helped put up the insulaton in the walls
its now 48 hours later and im still itching

ive done a lot of building stuff and thought i knew a lot
about carpentry painting insulating tools
but after a few weeks i realize how little i knew

have learned a lot
how to use tools and power tools ive not used before
how to cut those dang angles on things i couldnt figure out
the one skill i have not worked on though is roofing
my wife she said no getting on the roof
(she better watch out or ill throw a snake on her)

she didnt want me to be on that ladder list or be one of the
ladder guys
(my patients usually males would fall off ladders and i would
call them ladder guys and tell them they were on the ladder list)


















there was a big pile of concrete that was about to be broken
up and thrown in the large dumpster to be hauled off
but i rescued it
my wife she and i went up yesterday to the site and broke up the
concrete with a sledge hammer
well i did the sledge hammer work

we took the good pieces and made a bed for the home owners
flower bed
the flat pieces and small pieces ive brought home to use in a project here
at the country n

just need to recycle stuff as much as we can

i also dumpster dived at the site and pulled out what cardboard i could
retrieve to use in making the owner her square foot garden
wasnt easy as the dumpster is one of those tall ones that require
a ladder to climb up on it
no i didnt join the ladder list

TANKS DONE
my wife she and i and a teacher sponsor and student put in place
a rain water tank that holds 2500 gallons at a building on campus
at one of the local large high schools


















think everyone was skeptical that it would fit and work
but ive done several of these large tanks
usually by myself

we dug out a pad for the tank
moved it about 30 feet to sit under the down spout
leveled it
put in the faucet for the hoses
put on a screen on the top opening for the water to go through

now just add rain and they are ready to go

KITES
this weekend was the kite festival here in austin texas
its located at the large park
the one where the acl music festival is every year
there are usually 20000+ people that show up
here are some pictures from the local paper and some from
a local tv station

there are all kinds of kites and people there
the kids have a great time

here at the country n we would have an annual party and
the kids (of all ages) use to love to fly kites
its just something special flying a kite

this years festival was being threatened by a lack of funding
there was concerns that it may have to be discontinued
but they managed to pull it off again this year
hope they can continue to fund it as
so many people enjoy this weekend and festival

lets keep those kites flying
before a generation goes by and never gets to experience
kite flying

the organicgreen doctor

No comments:

Post a Comment